home   |   contact upm   |   find upm   |   after sales support

UPM Machinery Sales - Belt Conveyors - Stainless Steel Conveyors - Plastic Conveyors - Plastic Ancillary Equipment  

The Queens Award For Enterprise Innovation 2007   

Winner - Plastics Industry Awards 2006 - Best Technology Application   

Home Page

Conveyors - NEW RANGE

Standard Conveyors

Plastic Conveyors

Stainless Steel Conveyors

Bespoke Systems

Accessories & Spares

Product Handling

Weighing

Counting

Box Indexing

Infrared Drying

Overview

Products

Testimonials

Material Handling

Hopper Loaders

Dehumidifier Dryers

Hot Air Dryers

Volumetric Dosing

Granulators / Reclaim

Systems

Gravimetric Blending

Dosing Blending Systems

News

Press Releases

UPM in the News

UPM Awards

Events & Exhibitions

About UPM

The Company

The Team

Contact UPM

Find UPM

After Sales Support

Site Map


UPM Box Indexing

Download Details in PDF format


 

UPM Box Indexing System

Installation and Tote Indexing system setup

  • control panelConnect the main power 16amp plug 3ph 400v to the supply socket.

  • Connect the 32 pin Hartin plug to the process machine socket and this will interface with the machine emergency stop circuit and mold cycle count.

  • Connect compressed air to the tote handler air filter regulator and set it at 3 bar. Please note that some of the infeed swan neck conveyors have static de-ioniser bars fitted and these require compressed to the air filter regulators and set at 0.5 – 1 bar.

  • Turn the Tote control mains power on and press the green CONTROL ON button, which will illuminate.

  • Once the PLC test sequence has finished the Tote indexing system can setup.

 

  • Control PanelOn the control screen the operator can set how many mold cycles are required in each tote by setting the SP (Set Point) value. To do this press ENTER and then use the UP or DOWN arrows to change the value and the press ENTER again to finish the set up.

  • The PV value can not be changed manually as it is the actual mold cycle count from the process machine.

  • The “Swan neck conveyor” that conveys components into the tote has a delay timer that can be set by pressing either the UP/DOWN arrows, then press ENTER to adjust the value. The delay time value is the time in seconds it takes for the final mold cycle to drop components and elevate them into the totes.

 

  • The operator can now load empty totes onto the right hand conveyor lane and the control will automatically start up in the incline conveyor and start counting mold cycles once the set up sequence is complete.

  • NOTE: To stop the Incline conveyor and index a part full Tote press the F1 button once. There is a delay of 10 seconds and then the tote will index over.

  • During normal operation the swan neck conveyor will feed parts into the totes and once the SP (Set Point) target is reached the full tote will move across onto the out feed conveyor and a new empty tote will move in to position below the infeed chute and the cycle will restart. The operator can move a full tote out by pressing the green button located on the left hand frame.

 

Tote Indexing system alarm screens

  • Control PanelActuator Fault! Perform a visual check on the pneumatic linear actuator; this is the arm that moves the totes from the right hand conveyor lane to the left hand side. If the linear actuator is not working correctly check the pneumatic air pressure is ok. If the linear actuator has moved out of sequence the operator needs to isolate the mains power supply turn off the pneumatic air and remove the tote. Reset the mains power and pneumatic air, press the control on button and the system will restart with the linear actuator in the correct position.

  • To manually enter the alarm screens press the ESC button on the control, SETUP press the enter button, DISPLAY ALARM press the enter button, ALARM PAGE press the enter button to view a list of current alarms. The OPERATOR AND DIAGNOSTIC MENU is for UPM technicians to use during setup.

 

  • Control PanelEmpty Box required alarm! Indicates that the operator needs to place new empty totes onto the right hand conveyor lane and once completed the alarm will stop. The control will continue to count the mold cycles from the process machine.

 

  • Control PanelDischarge Conveyor Full! Indicates that the operator needs to remove the full totes from the left hand conveyor lane place new empty totes onto the right hand conveyor lane and once completed the alarm will stop. The control will continue to count the mold cycles from the process machine.

 

  • Control PanelA Conveyor Circuit Breaker Has Tripped! Indicates that an engineer needs to isolate the mains power and open the control panel front door to perform a visual check on the circuit breakers, identify the problem and once completed the alarm will stop.

 

 


  Download Product Details in PDF format


Contact UPM

 

UPM | Plastic Conveyors | Stainless Steel Conveyors | Belt Conveyors | Infrared Drying | Gravimetric Blending | Material Handling | Hopper Loaders

 

UPM Machinery Sales Ltd.

Unit 5, Elder Way , Langley Business Park , Slough , Berkshire  SL3 6EP

tel: +44 (0)1753 548 801 - fax: +44 (0)1753 544 115

Company Registered in England No. 2874515

copyright © 2007-2008 UPM Machinery Sales Ltd.

website created by The Media Gurus